Tenders listed below are in PDF format. You should have Acrobat reader installed on your machine. To install Acrobat Reader Click here
To download Tender document click on Description and use Save as option.
Tenders are listed in order of Tender Open Date

 

Home

Downloadable Tender Notifications

Category:  
S.No. Tender No. Description Tender Open Sale Open From Sale Close On
1 BCCL/ CED/ JNTA /QTN-16/2021-22/ dtd:30.12.2021 Routine Maintenance of Community centre situated at different location of Jagjiwan Nagar and Karmik Nagar under JNTA. 07/12/2021 at 11:00AM 1-12-2021 4-12-2021
2 BCCL/GM/Dy. Mgr.(Per/Admn.)/Printing Material/2021/ 155 Date: 24.11.2021 Supply of Printing Material at Kusunda Area . 07/12/2021 at 03:00 PM 02-12-2021 04-12-2021
3 BCCL/GM/Dy. Mgr.(Per/Admn.)/Printing Material/2021/ 156 Date: 24.11.2021 Supply of Printing Material at Kusunda Area . 07/12/2021 at 03:00 PM 02-12-2021 04-12-2021
4 BCCL/Katras-IV/MM-Pur/Hose Assy/21-22/53 dated 15.11.2021 Hose Assembly for different size/no 09/12/2021 at 11:30 AM 17-11-2021 9-12-2021
5 Pur/AX11/21-22/Open Tender/32 dated. 24.11.2021 Procurement of HEMM Spares for IDM 30 Drill Machine 09/12/2021 at 3.00pm 24-11-2021 8-12-2021
6 BCCL/LA/PUR/OTE/21-22/63 Date: 19.11.2021 Wheel Stud 2285275 Wheel Stud 2285280 10/12/2021 at 11.30am 19-11-2021 10-12-2021
7 BCCL/LA/PUR/OTE/21-22/62 Date: 19.11.2021 Al. Straight Connector Isolator to 2 Inch IPS Tube 10/12/2021 at 11.30am 19-11-2021 10-12-2021
8 BCCL/LA/Pur/OTE/21-22 /61 Dated:- 19/11/2021 Procurement of Potential Transformer suitable for mine line input 550 Volt and H.T. Fuse for P.T. 3.3 Kv 05 Amps 10/12/2021 at 11.30am 19-11-2021 10-12-2021
9 BCCL/LA/PUR/OTE/21-22/64 Date: 19.11.2021 Hose 1260196 Hose 8W4341 Tube (1.7-M) 5P6007 Hose As 1357903 Hose 1357901 10/12/2021 at 11.30am 19-11-2021 10-12-2021
10 BCCL/LA/PUR/OTE/21-22/65 Date: 19.11.2021 Spout Bushing H.T. Switch 10/12/2021 at 11.30am 19-11-2021 10-12-2021
11 BCCL/LA/PUR/OTE/21-22/66 Date: 19.11.2021 Procurement of Overload and Switch Selector 10/12/2021 at 11.30am 19-11-2021 10-12-2021
12 BCCL/LA/PUR/OTE/21-22/67 Date: 19.11.2021 Procurement of Spring shackle and repair kit. 10/12/2021 at 11.30am 19-11-2021 10-12-2021
13 BCCL/LA/PUR/OTE/21-22/68 Date: 19.11.2021 Procurement of Motor Pinion. 10/12/2021 at 11.30am 19-11-2021 10-12-2021
14 BCCL/LA/PUR/OTE/21-22/69 Date: 19.11.2021 Procurement of Hose Assy 10/12/2021 at 11.30am 19-11-2021 10-12-2021
15 BCCL/GM/Area Mgr. (Admn.)/Printing Material/2021/162 Date: 30.11.2021 Supply of Stationery Material at Kusunda Area 13/12/2021 at 03:00 PM 09-12-2021 11-12-2021
16 BCCL/GM/Dy. Mgr.(Per/Admn.)/Xerox Paper/2021/163 Date: 30.11.2021 Supply of (A-4) Xerox Paper at Kusunda Area . 13/12/2021 at 03:00 PM 09-12-2021 11-12-2021
17 BCCL/KA/PUR/Open Tender/21-22/ 089 Date: 03.12.2021 Item Description in Brief Supply of Item for Kusunda Area 1) BOARD; RETROR EFLECTV,4X3FT,ACP,W/MTL STND (FLORESCENT METAL SAFETY BOARD WITH WRITE UP 3FTX4FT SIZE) 13/12/2021 at 11:30 AM 03-12-2021 13-12-2021
18 BCCL/KA/PUR/Open Tender/21-22/ 088 Date: 03.12.2021 Item Description in Brief Supply of Items for Kusunda Area 1) MOVING CONTACT ASSLY(MOVING CONTACT 400AMPS 11 KV OCB) 2) FIXED CONTACT ASSLY 400AMP(FIXED CONTACT 400AMPS 11 KV OCB) 13/12/2021 at 11:30 AM 03-12-2021 13-12-2021
19 BCCL/KA/PUR/Open Tender/21-22/ 087 Date: 03.12.2021 Item Description in Brief Supply of Item for Kusunda Area 1) MTR TST;CLMP,0-1200/DC,DGTL(CIAMP METER 200AM/2000MA-10AM/AC/DC POL 600) 13/12/2021 at 11:30 AM 03-12-2021 13-12-2021
20 BCCL/CMC/F-e-NIT/Coal/Tptn46/Block-II/2021/534 Dated:24.11.2021 Tender Document for the work of Transportation of coal from coal face to different destination including hiring of crusher for crushing of coal and allied jobs under Block- II area of BCCL for a period of 1095 days. 16/12/2021 at 11.00 26-11-2021 13-12-2021
21 BCCL/CMC/F-e-NIT/Coal/Tptn46/Block-II/2021/534 Dated:24.11.2021 Transportation of coal from coal face to different destination including hiring of crusher for crushing of coal and allied jobs under Block- II area of BCCL for a period of 1095 days. 16/12/2021 at 11.00 26-11-2021 13-12-2021
22 PUR/AXII/21-22/open Tender/33 Dated: - 30.11.2021 Control Gear Box 400 Watt X 220 /240 Volt For HPSV Lamp 16/12/2021 at 3.00pm 30-11-2021 15-12-2021
23 Pur/AX11/21-22/Open Tender/34 dated. 01.12.2021 HEMM Spares 16/12/2021 at 3.00pm 1-12-2021 15-12-2021
24 BCCL/BA-IX/PUR/ OPEN TENDER /21 -22/105 Supply for VCB Shunt Trip Coil. 17/12/2021 at 01:00 PM 26-11-2021 16-12-2021
25 BCCL/BA-IX/PUR/ OPEN TENDER /21 -22/104 Supply of Moving Contact For SD- 15 Switch. 17/12/2021 at 01:00 PM 26-11-2021 16-12-2021
26 BCCL/BA-IX/PUR/ OPEN TENDER /21 -22/103 Supply for Electrode. 17/12/2021 at 01:00 PM 26-11-2021 16-12-2021
27 BCCL/BA-IX/PUR/ OPEN TENDER /21 -22/102 Supply of PT 11 KV, 110 Volt 3 Phase for 11KV Switch 17/12/2021 at 01:00 PM 26-11-2021 16-12-2021
28 BCCL/BA-IX/PUR/ OPEN TENDER /21 -22/101 Supply for Heavy Duty Glass Fibre / FRP Highly Insulated, Self-Supporting Type Ladder 17/12/2021 at 01:00 PM 26-11-2021 16-12-2021
29 BCCL/BA-IX/PUR/ OPEN TENDER /21 -22/100 Supply for Silicon Rubber Compound. 17/12/2021 at 01:00 PM 26-11-2021 16-12-2021
30 BCCL/BA-IX/PUR/ OPEN TENDER /21 -22/099 Supply for Contactor Kit. 17/12/2021 at 01:00 PM 26-11-2021 16-12-2021
31 BCCL/BA-IX/PUR/ OPEN TENDER /21 -22/108 Dated: 30/11/2021 Supply for Ampere Meter With C.T. 21/12/2021 at 01:00 PM 1-12-2021 20-12-2021
32 BCCL/BA-IX/PUR/ OPEN TENDER /21 -22/109 Dated: 30/11/2021 Supply for B.T. O. UNIT. 21/12/2021 at 01:00 PM 1-12-2021 20-12-2021
33 BCCL/BA-IX/PUR/ OPEN TENDER /21 -22/110 Dated: 30/11/2021 Supply for EKG Shovel Spares. 21/12/2021 at 01:00 PM 1-12-2021 20-12-2021
34 BCCL/CMC/MDO/LOHAPATTI UG/436 Date: 08.10.2021 VOLUME_II GEOLOGICAL REPORT ON KUNJI_NUTANDIH_BHURUNGIA BLOCK_1979-1-350 for the work of Re-open,salvage, rehabilitate, developandoperate for excavation/ extractionofcoal from Lohapatti underground coal mine anddelivery thereoftothe Authority 07/01/2022 at 11.00 12-10-2021 6-1-2022
35 BCCL/CMC/MDO/LOHAPATTI UG/436 Date: 08.10.2021 GEOLOGICAL REPORT ON KALYANPUR_PATCH2-compressed for the work of Re-open,salvage, rehabilitate, developandoperate for excavation/ extractionofcoal from Lohapatti underground coal mine anddelivery thereoftothe Authority 07/01/2022 at 11.00 12-10-2021 6-1-2022
36 BCCL/CMC/MDO/LOHAPATTI UG/436 Date: 08.10.2021 GEOLOGICAL REPORT ON KALYANPUR BLOCK_PATCH1_TEXT_RESERVE-151-320 for the work of Re-open,salvage, rehabilitate, developandoperate for excavation/ extractionofcoal from Lohapatti underground coal mine anddelivery thereoftothe Authority 07/01/2022 at 11.00 12-10-2021 6-1-2022
37 BCCL/CMC/MDO/LOHAPATTI UG/436 Date: 08.10.2021 GEOLOGICAL REPORT ON KALYANPUR BLOCK_PATCH1_TEXT_RESERVE-1-150 for the work of Re-open,salvage, rehabilitate, developandoperate for excavation/ extractionofcoal from Lohapatti underground coal mine anddelivery thereoftothe Authority 07/01/2022 at 11.00 12-10-2021 6-1-2022
38 BCCL/CMC/MDO/LOHAPATTI UG/436 Date: 08.10.2021 Tender Document for the work of Re-open,salvage, rehabilitate, develop and operate for excavation/ extraction of coal from Lohapatti underground coal mine and delivery thereof to the Authority 07/01/2022 at 11.00 12-10-2021 6-1-2022
39 BCCL/CMC/MDO/LOHAPATTI UG/436 Date: 08.10.2021
Corrigendum/Cancellation 1 dated 22/10/2021
Re-open,salvage, rehabilitate, develop and operate for excavation/ extraction of coal from Lohapatti underground coal mine and delivery thereof to the Authority 07/01/2022 at 11.00 12-10-2021 6-1-2022
40 BCCL/CMC/MDO/LOHAPATTI UG/436 Date: 08.10.2021 GEOLOGICAL REPORT ON LOHAPATTI EAST_PRODUCTION SUPPORT_2013 for the work of Re-open,salvage, rehabilitate, developandoperate for excavation/ extractionofcoal from Lohapatti underground coal mine anddelivery thereoftothe Authority 07/01/2022 at 11.00 12-10-2021 6-1-2022
41 BCCL/CMC/MDO/LOHAPATTI UG/436 Date: 08.10.2021 GEOLOGICAL REPORT ON LOHAPATTI_EAST_1997 for the work of Re-open,salvage, rehabilitate, developandoperate for excavation/ extractionofcoal from Lohapatti underground coal mine anddelivery thereoftothe Authority 07/01/2022 at 11.00 12-10-2021 6-1-2022
42 BCCL/CMC/MDO/LOHAPATTI UG/436 Date: 08.10.2021 high power committee recommendations for the work of Re-open,salvage, rehabilitate, developandoperate for excavation/ extractionofcoal from Lohapatti underground coal mine anddelivery thereoftothe Authority 07/01/2022 at 11.00 12-10-2021 6-1-2022
43 BCCL/CMC/MDO/LOHAPATTI UG/436 Date: 08.10.2021 integritypact for the work of Re-open,salvage, rehabilitate, developandoperate for excavation/ extractionofcoal from Lohapatti underground coal mine anddelivery thereoftothe Authority 07/01/2022 at 11.00 12-10-2021 6-1-2022
44 BCCL/CMC/MDO/LOHAPATTI UG/436 Date: 08.10.2021 mine profile of lohapatti with plans and list of assets including notified price of coal for the work of Re-open,salvage, rehabilitate, developandoperate for excavation/ extractionofcoal from Lohapatti underground coal mine anddelivery thereoftothe Authority 07/01/2022 at 11.00 12-10-2021 6-1-2022
45 BCCL/CMC/MDO/LOHAPATTI UG/436 Date: 08.10.2021 mouza plan with circle rate of land_compressed for the work of Re-open,salvage, rehabilitate, developandoperate for excavation/ extractionofcoal from Lohapatti underground coal mine anddelivery thereoftothe Authority 07/01/2022 at 11.00 12-10-2021 6-1-2022
46 BCCL/CMC/MDO/LOHAPATTI UG/436 Date: 08.10.2021 VOLUME_II GEOLOGICAL REPORT ON KUNJI_NUTANDIH_BHURUNGIA BLOCK_1979-351-721 for the work of Re-open,salvage, rehabilitate, developandoperate for excavation/ extractionofcoal from Lohapatti underground coal mine anddelivery thereoftothe Authority 07/01/2022 at 11.00 12-10-2021 6-1-2022
47 BCCL/CMC/MDO/LOHAPATTI UG/436 Date: 08.10.2021 VOLUME_I_GEOLOGICAL REPORT ON KUNJI_NUTANDIH_BHURUNGIA BLOCK_1979 for the work of Re-open,salvage, rehabilitate, developandoperate for excavation/ extractionofcoal from Lohapatti underground coal mine anddelivery thereoftothe Authority 07/01/2022 at 11.00 12-10-2021 6-1-2022
48 BCCL/CMC/MDO/MADHUBAND UG/2021/456 Dated: 18.10.2021 VOLUME_2_PART_A (B)_GEOLOGICAL REPORT ON MADHUBAND UG BLOCK_1982(601-1200)-301-600 for the work of Re-open,salvage, rehabilitate, developand operate for excavation/ extractionofcoal from Madhuband Underground Coal Mineanddelivery thereoftothe Authority 18/01/2022 at 11.00 22-10-2021 15-1-2022
49 BCCL/CMC/MDO/MADHUBAND UG/2021/456 Dated: 18.10.2021 VOLUME_2_PART_A_(C) GEOLOGICAL REPORT ON MADHUBAND UG BLOCK_1982(1201-1760)-266-560 for the work of Re-open,salvage, rehabilitate, developand operate for excavation/ extractionofcoal from Madhuband Underground Coal Mineanddelivery thereoftothe Authority 18/01/2022 at 11.00 22-10-2021 15-1-2022
50 BCCL/CMC/MDO/MADHUBAND UG/2021/456 Dated: 18.10.2021 Re-open,salvage, rehabilitate, develop and operate for excavation/ extraction ofcoal from Madhuband Underground Coal Mine and delivery thereof to the Authority 18/01/2022 at 11.00 22-10-2021 15-1-2022
51 BCCL/CMC/MDO/MADHUBAND UG/2021/456 Dated: 18.10.2021 Tender Document for the work of Re-open,salvage, rehabilitate, developand operate for excavation/ extractionofcoal from Madhuband Underground Coal Mineanddelivery thereoftothe Authority 18/01/2022 at 11.00 22-10-2021 15-1-2022
52 BCCL/CMC/MDO/MADHUBAND UG/2021/456 Dated: 18.10.2021 Appendix-XI of the tender document for the work of Re-open,salvage, rehabilitate, developand operate for excavation/ extractionofcoal from Madhuband Underground Coal Mineanddelivery thereoftothe Authority 18/01/2022 at 11.00 22-10-2021 15-1-2022
53 BCCL/CMC/MDO/MADHUBAND UG/2021/456 Dated: 18.10.2021 Appendix - VIII of tender document for the work of Re-open,salvage, rehabilitate, developand operate for excavation/ extractionofcoal from Madhuband Underground Coal Mineanddelivery thereoftothe Authority 18/01/2022 at 11.00 22-10-2021 15-1-2022
54 BCCL/CMC/MDO/MADHUBAND UG/2021/456 Dated: 18.10.2021 GR for the work of Re-open,salvage, rehabilitate, developand operate for excavation/ extractionofcoal from Madhuband Underground Coal Mineanddelivery thereoftothe Authority 18/01/2022 at 11.00 22-10-2021 15-1-2022
55 BCCL/CMC/MDO/MADHUBAND UG/2021/456 Dated: 18.10.2021 GR for the work of Re-open,salvage, rehabilitate, developand operate for excavation/ extractionofcoal from Madhuband Underground Coal Mineanddelivery thereoftothe Authority 18/01/2022 at 11.00 22-10-2021 15-1-2022
56 BCCL/CMC/MDO/MADHUBAND UG/2021/456 Dated: 18.10.2021 MERGED SF,FC,WORKING,LOCATION, SURFACE,GEOLOGICAL,PROPOSED BOREHOLE,ELECTRICAL LAYOUT for the work of Re-open,salvage, rehabilitate, developand operate for excavation/ extractionofcoal from Madhuband Underground Coal Mineanddelivery thereoftothe Authority 18/01/2022 at 11.00 22-10-2021 15-1-2022
57 BCCL/CMC/MDO/MADHUBAND UG/2021/456 Dated: 18.10.2021 Mine profile for the work of Re-open,salvage, rehabilitate, developand operate for excavation/ extractionofcoal from Madhuband Underground Coal Mineanddelivery thereoftothe Authority 18/01/2022 at 11.00 22-10-2021 15-1-2022
58 BCCL/CMC/MDO/MADHUBAND UG/2021/456 Dated: 18.10.2021 Mouza plan for the work of Re-open,salvage, rehabilitate, developand operate for excavation/ extractionofcoal from Madhuband Underground Coal Mineanddelivery thereoftothe Authority 18/01/2022 at 11.00 22-10-2021 15-1-2022
59 BCCL/CMC/MDO/MADHUBAND UG/2021/456 Dated: 18.10.2021 Mouza Plan for the work of Re-open,salvage, rehabilitate, developand operate for excavation/ extractionofcoal from Madhuband Underground Coal Mineanddelivery thereoftothe Authority 18/01/2022 at 11.00 22-10-2021 15-1-2022
60 BCCL/CMC/MDO/MADHUBAND UG/2021/456 Dated: 18.10.2021 VOLUME_1(PART A)_GEOLOGICAL REPORT ON MADHUBAND UG BLOCK_1982 (1)(page1-220)-1-110 for the work of Re-open,salvage, rehabilitate, developand operate for excavation/ extractionofcoal from Madhuband Underground Coal Mineanddelivery thereoftothe Authority 18/01/2022 at 11.00 22-10-2021 15-1-2022
61 BCCL/CMC/MDO/MADHUBAND UG/2021/456 Dated: 18.10.2021 VOLUME_1(PART A)_GEOLOGICAL REPORT ON MADHUBAND UG BLOCK_1982 (1)(page1-220)-111-220 for the work of Re-open,salvage, rehabilitate, developand operate for excavation/ extractionofcoal from Madhuband Underground Coal Mineanddelivery thereoftothe Authority 18/01/2022 at 11.00 22-10-2021 15-1-2022
62 BCCL/CMC/MDO/MADHUBAND UG/2021/456 Dated: 18.10.2021 VOLUME_1(PART C)_GEOLOGICAL REPORT ON MADHUBAND UG BLOCK_1982 (1)(451-700)-1-125 for the work of Re-open,salvage, rehabilitate, developand operate for excavation/ extractionofcoal from Madhuband Underground Coal Mineanddelivery thereoftothe Authority 18/01/2022 at 11.00 22-10-2021 15-1-2022
63 BCCL/CMC/MDO/MADHUBAND UG/2021/456 Dated: 18.10.2021 VOLUME_1(PART C)_GEOLOGICAL REPORT ON MADHUBAND UG BLOCK_1982 (1)(451-700)-126-250 for the work of Re-open,salvage, rehabilitate, developand operate for excavation/ extractionofcoal from Madhuband Underground Coal Mineanddelivery thereoftothe Authority 18/01/2022 at 11.00 22-10-2021 15-1-2022
64 BCCL/CMC/MDO/MADHUBAND UG/2021/456 Dated: 18.10.2021 VOLUME_1(PART D)_GEOLOGICAL REPORT ON MADHUBAND UG BLOCK_1982 (1)(701-950)-1-125 for the work of Re-open,salvage, rehabilitate, developand operate for excavation/ extractionofcoal from Madhuband Underground Coal Mineanddelivery thereoftothe Authority 18/01/2022 at 11.00 22-10-2021 15-1-2022
65 BCCL/CMC/MDO/MADHUBAND UG/2021/456 Dated: 18.10.2021 VOLUME_1(PART D)_GEOLOGICAL REPORT ON MADHUBAND UG BLOCK_1982 (1)(701-950)-126-250 for the work of Re-open,salvage, rehabilitate, developand operate for excavation/ extractionofcoal from Madhuband Underground Coal Mineanddelivery thereoftothe Authority 18/01/2022 at 11.00 22-10-2021 15-1-2022
66 BCCL/CMC/MDO/MADHUBAND UG/2021/456 Dated: 18.10.2021 VOLUME_1_(PART B) GEOLOGICAL REPORT ON MADHUBAND UG BLOCK_1982 (1)(page 221-450)-1-130 for the work of Re-open,salvage, rehabilitate, developand operate for excavation/ extractionofcoal from Madhuband Underground Coal Mineanddelivery thereoftothe Authority 18/01/2022 at 11.00 22-10-2021 15-1-2022
67 BCCL/CMC/MDO/MADHUBAND UG/2021/456 Dated: 18.10.2021 VOLUME_1_(PART B) GEOLOGICAL REPORT ON MADHUBAND UG BLOCK_1982 (1)(page 221-450)-131-230 for the work of Re-open,salvage, rehabilitate, developand operate for excavation/ extractionofcoal from Madhuband Underground Coal Mineanddelivery thereoftothe Authority 18/01/2022 at 11.00 22-10-2021 15-1-2022
68 BCCL/CMC/MDO/MADHUBAND UG/2021/456 Dated: 18.10.2021 VOLUME_1_(PART E) GEOLOGICAL REPORT ON MADHUBAND UG BLOCK_1982 (1)(951-1100) for the work of Re-open,salvage, rehabilitate, developand operate for excavation/ extractionofcoal from Madhuband Underground Coal Mineanddelivery thereoftothe Authority 18/01/2022 at 11.00 22-10-2021 15-1-2022
69 BCCL/CMC/MDO/MADHUBAND UG/2021/456 Dated: 18.10.2021 VOLUME_1_(PART F) GEOLOGICAL REPORT ON MADHUBAND UG BLOCK_1982 (1)(1101-1287) for the work of Re-open,salvage, rehabilitate, developand operate for excavation/ extractionofcoal from Madhuband Underground Coal Mineanddelivery thereoftothe Authority 18/01/2022 at 11.00 22-10-2021 15-1-2022
70 BCCL/CMC/MDO/MADHUBAND UG/2021/456 Dated: 18.10.2021 VOLUME_2_PART_A (B)_GEOLOGICAL REPORT ON MADHUBAND UG BLOCK_1982(601-1200)-1-300 for the work of Re-open,salvage, rehabilitate, developand operate for excavation/ extractionofcoal from Madhuband Underground Coal Mineanddelivery thereoftothe Authority 18/01/2022 at 11.00 22-10-2021 15-1-2022
71 BCCL/CMC/MDO/MADHUBAND UG/2021/456 Dated: 18.10.2021 VOLUME_2_PART_A_(A)GEOLOGICAL REPORT ON MADHUBAND UG BLOCK_1982(1-600)-1-300 for the work of Re-open,salvage, rehabilitate, developand operate for excavation/ extractionofcoal from Madhuband Underground Coal Mineanddelivery thereoftothe Authority 18/01/2022 at 11.00 22-10-2021 15-1-2022
72 BCCL/CMC/MDO/MADHUBAND UG/2021/456 Dated: 18.10.2021 VOLUME_2_PART_A_(A)GEOLOGICAL REPORT ON MADHUBAND UG BLOCK_1982(1-600)-301-600 for the work of Re-open,salvage, rehabilitate, developand operate for excavation/ extractionofcoal from Madhuband Underground Coal Mineanddelivery thereoftothe Authority 18/01/2022 at 11.00 22-10-2021 15-1-2022
73 BCCL/CMC/MDO/MADHUBAND UG/2021/456 Dated: 18.10.2021 VOLUME_2_PART_A_(C) GEOLOGICAL REPORT ON MADHUBAND UG BLOCK_1982(1201-1760)-1-265 for the work of Re-open,salvage, rehabilitate, developand operate for excavation/ extractionofcoal from Madhuband Underground Coal Mineanddelivery thereoftothe Authority 18/01/2022 at 11.00 22-10-2021 15-1-2022
74 BCCL/CMC/MDO/MADHUBAND UG/2021/456 Dated: 18.10.2021 VOLUME_2_PART_B_GEOLOGICAL REPORT ON MADHUBAND UG BLOCK_1982 for the work of Re-open,salvage, rehabilitate, developand operate for excavation/ extractionofcoal from Madhuband Underground Coal Mineanddelivery thereoftothe Authority 18/01/2022 at 11.00 22-10-2021 15-1-2022
75 GM/BII/AM(E&M)/2013-14/400/1758 Dt:27.11.13 Cancellation of Tender NoNIT NO.GM/BII/(E&M)CO/Tender/2013-14./16/1199 dated: 21.09.13, for the subject work of Conversion of 30 T Benedih road w/Bridge to pit less type with capacity enhancement up to 60T, 30T Madhuban coal(W) maingate road w/bridge to pit less type with capacity enhancement up to 60T and 30T NKSSY road W/bridge pit less type with 04 nos load cells platform size 9mtr. X 3mtr and capacity enhancement up to 60T 13/11/2029 at 12:00 Noon 29-11-2013 31-12-2013
76 MRS/Civ-Engg/NIT/13-14/466 dated11/01/14 “Repair/Maintenance work in the G.M. Office complex at MRS, Dhansar.” 14/01/2030 at 11:30 am 30-01-14 27.01-14
77 GM/Ar-I/Civil/Qtn/18-19/01dtd19.05.18 Repairing and Maintenance of Qtr. No. 70 at Pure Barora under Muraidih Colliery. 18/05/2030 at 03:00 p 23-05-18 28-05-2018